Installation Instructions

Preparing for Installation

Important! Perform the following steps BEFORE Installation of the monitor into the
panel.

1. Ensure that sufficient power is available.

2. Ensure that sufficient space is available to allow for proper air flow into and out of the unit.

3. Ensure that the air temperature around the unit (top and bottom) will not exceed the rated

specifications of the unit.

The maximum rated temperature of the HIS-RL17 is 50°°°°C (122°°°°F).

Also, remember that even though this product is designed to operate at

50

°

°

°

°

C, the life span of any electronic device is shortened when it is con-

sistently operated at high temperatures. Therefore it is wise to take
steps to keep the temperature of the ambient air around the unit as low
as possible.


4. Ensure that the ambient humidity of the air around the unit does not exceed the rated

specifications for the unit.

The maximum rated humidity for the HIS-RL17 is 90% non-condensing.


5. If the display will be mounted far from the computer using long cables or extender de-

vices, the full configuration should be bench-tested prior to final installation for easy trou-
bleshooting.