beautypg.com

Installation, 7 installation of the communications-card option – MGE UPS Systems 2200 User Manual

Page 15

background image

34007115EN/AA

- Page 15

2. Installation

2.7 Installation of the communications-card option

1 - Remove the slot cover 5 secured by
two screws.

2 - Insert the card in the slot.

3 - Secure the cover with the two screws.

Slot for the communications-card
option.

5

IN

OUT

TO BATTERY

CABINET

DATA LINE PROTECTION

RS232

It is not necessary to shut down the UPS to install the communications card.