Dca-85usj — generator shut-down procedure – Multiquip MQ POWER ULTRA-SILENTTM SERIES GENERATOR DCA-85USJ User Manual
Page 40
PAGE 40 — DCA-85USJ — OPERATION AND PARTS MANUAL — REV. #0 (09/17/04)
Shutdown Procedure
To shutdown the generator use the following procedure:
1. Place both the MAIN, GFCI and LOAD circuit breakers
as shown in Figure 39 to the OFF position.
3. Let the engine cool by running it for 3-5 minutes with no
load applied.
4. Place the
MPEC Control Switch (Figure 55) to the
OFF/RESET position.
Figure 55. MPEC Control Switch (Off/Reset)
5. Verify that the
all status LED on the MPEC display
are OFF (not lit).
6. Remove all loads from the generator.
DCA-85USJ — GENERATOR SHUT-DOWN PROCEDURE
Emergency Shutdown Procedure
1. To shut-down the engine in the event of an emergency,
switch the
MAIN, GFCI and LOAD (Figure 39) circuit
breakers to OFF position.
2. Place the
MPEC Control Switch switch (Figure 55) to
the OFF/RESET position.
NEVER stop the engine suddenly except in an emergency.
DO NOT use the emergency stop switch a as method of
shutting down the generator. This switch is ONLY to be
used in the event of an emergency.
WARNING - SHUTTING DOWN THE GENERATOR