8. replacing switch and/or head tube – Miller Electric Renegade 180 User Manual
Page 39
![background image](/manuals/117924/39/background.png)
.
Complete Parts List available at www. MillerWelds.com
OM-228 042 Page 35
8-8. Replacing Switch And/Or Head Tube
Ref. ST-800 795-C
Tools Needed:
19 mm
1
3
2
4
5
6
Turn off welding power
source/wire feeder and dis-
connect gun.
1
Handle Locking Nut
2
Switch Housing
3
Handle
4
Vise
5
Head Tube
6
Jam Nut
Remove handle locking nut.
Remove switch housing. Install
new switch and connect leads (po-
larity is not important). Reassemble
in reverse order.
Secure head tube in vise.
Loosen jam nut. Remove from vise
and turn head tube out by hand.
Hand tighten head tube into cable
connector. Place head tube in vise
and tighten until nuts are tight.
Remove from vise. Reposition han-
dle and install switch housing. Se-
cure with handle locking nut.
See also other documents in the category Miller Electric Tools:
- OM-2241 (32 pages)
- ICE-27C (36 pages)
- Arc Welding Power Source (4 pages)
- INVISION 456 CC (44 pages)
- Welder (132 pages)
- SS-75D12 (44 pages)
- Load Bank LBP-350 (2 pages)
- OM-193 084E (36 pages)
- 750MPa (2 pages)
- APT-1000 (20 pages)
- OM-220 390F (48 pages)
- 271 (48 pages)
- Welding (32 pages)
- DC (72 pages)
- OM-129 (70 pages)
- XLi (24 pages)
- S-64 (36 pages)
- ICE-27T (36 pages)
- PipePro 304 (76 pages)
- AA40GBU (28 pages)
- D-64 (40 pages)
- Auto Arc XLT 165 (48 pages)
- 185 DX (56 pages)
- S-32S (4 pages)
- Big 40 DC/TIG 55500 A (8 pages)
- Big Blue 600D (60 pages)
- Millermatic 140 (60 pages)
- pmn (36 pages)
- LMSW Series (2 pages)
- 1250 (46 pages)
- Trailblazer Pro 350 D (8 pages)
- TS (76 pages)
- S-22P12 (28 pages)
- 602 (40 pages)
- Axcess 300 (56 pages)
- MOG-400 (40 pages)
- WC-24 (20 pages)
- Big Blue 502P (64 pages)
- Dimension 1000 (44 pages)
- DS-74DX12 (52 pages)
- 350 VS (36 pages)
- 24A (32 pages)
- GA-16C (12 pages)
- Big Blue 502D (116 pages)
- OM-229 038D (36 pages)