beautypg.com

Warning, A. for subbase installation, B. for direct connect installation – GE Zoneline 4100 User Manual

Page 14

background image

14

Installation Instructions

265 VOLT ELECTRICAL CONNECTION OPTIONS

WARNING:

Connection of this 265 V AC product to a branch circuit
MUST be done by direct connection in accordance with
the National Electrical Code. Plugging this unit into a
building-mounted exposed receptacle is not permitted
by code.

These models must be installed using the appropriate
GE power supply kit for the branch circuit amperage and
the electrical resistance heater wattage desired. Use the
POWER CONNECTION CHART on page 16 to determine
the correct kit required. One of the following installation
methods (A or B) must be used.

A. FOR SUBBASE INSTALLATION

Electrical subbase kits are available to provide a flexible
enclosure for direct connection.

*Not approved for use on 7000 BTU models.

The instructions provided with the selected subbase kit
must be carefully followed. It is the responsibility of the
installer to ensure the connection of components is done
in accordance with these instructions and all electrical
codes.

Branch Circuit and

Proper GE

Power

Unit Amperage Rating

Subbase Kit

Supply Kit

15

RAK204E15

RAK5172

20

RAK204E20

RAK5202

30

RAK204E30

RAK5302*

B. FOR DIRECT CONNECT

INSTALLATION

If an electrical subbase is not used, direct connection to
branch circuit wiring inside the provided junction box must
be done in accordance with the following steps.

Order the following Kit for 265-volt direct connection
as required:

*Not approved for use on 7000 BTU models.

Proceed to the “MAKE ELECTRICAL CONNECTION TO THE
UNIT” section.

Branch Circuit and

Power

Unit Amperage Rating

Supply Kit

15

RAK5157

20

RAK5207

30

RAK5307*

NOTE: Order Kit RAK4002CW to enable a quick
disconnect inside the junction box.

This manual is related to the following products: