Installation Instructions
265 VOLT ELECTRICAL CONNECTION OPTIONS
WARNING:
Connection of this 265 V AC product to a branch circuit
MUST be done by direct connection in accordance with
the National Electrical Code. Plugging this unit into a
building-mounted exposed receptacle is not permitted
by code.
These models must be installed using the appropriate
GE power supply kit for the branch circuit amperage and
the electrical resistance heater wattage desired. Use the
POWER CONNECTION CHART on page 16 to determine
the correct kit required. One of the following installation
methods (A or B) must be used.
A. FOR SUBBASE INSTALLATION
Electrical subbase kits are available to provide a flexible
enclosure for direct connection.
*Not approved for use on 7000 BTU models.
The instructions provided with the selected subbase kit
must be carefully followed. It is the responsibility of the
installer to ensure the connection of components is done
in accordance with these instructions and all electrical
codes.
Branch Circuit and
Proper GE
Power
Unit Amperage Rating
Subbase Kit
Supply Kit
15
RAK204E15
RAK5172
20
RAK204E20
RAK5202
30
RAK204E30
RAK5302*
B. FOR DIRECT CONNECT
INSTALLATION
If an electrical subbase is not used, direct connection to
branch circuit wiring inside the provided junction box must
be done in accordance with the following steps.
Order the following Kit for 265-volt direct connection
as required:
*Not approved for use on 7000 BTU models.
Proceed to the “MAKE ELECTRICAL CONNECTION TO THE
UNIT” section.
Branch Circuit and
Power
Unit Amperage Rating
Supply Kit
15
RAK5157
20
RAK5207
30
RAK5307*
NOTE: Order Kit RAK4002CW to enable a quick
disconnect inside the junction box.