beautypg.com

Technical data, Choosing the location, Technical data choosing the location – GE Monogram MONOGRAM ZCG3100 User Manual

Page 6: Installation

background image

6

Tools required:

• #2 Phillips head screwdriver

• Flat blade screwdriver

• Tape measure

• Spirit level

• 10" long 2x4

• Adjustable wrench or slip

joint pliers

• Drill and 1/8" drill bit

Parts List:

• 4 leveling feet caps

• 4 Phillips head screws

• 2 Slotted head screws

• 2 Tip-over brackets

• 2 90° clips

Optional Materials

(not supplied):

• Custom front panel

• Custom handle

• Custom toekick board

• 5 wood screws

Installation

Built-In Compactors

Technical
data

Electric Power—120V, 60 HZ, 5 amp
Circuit Requirement—15 or 20 amp grounded outlet
Motor Horsepower—1/3
Compacting Force—5000# max.

Container volume—1.4 cu. ft.
Weight—135 lbs.
Cycle Time—70 sec. max., 12 sec. min.

Choosing
the
location

This compactor is designed as a built-in appliance
only. It may be located in any convenient space under
a countertop. DO NOT OPERATE FREE-STANDING
because the compactor will tip over when the drawer
is pulled out.

This manual is related to the following products: