beautypg.com

Step 6 optional custom toekick, Installation – GE Monogram MONOGRAM ZCG3100 User Manual

Page 11

background image

Step 5
(continued)

If the countertop cannot be drilled into, slip the 90°
clips over the short leg of the bracket and screw into
the face of the cabinet.

11

To install custom toekick (not supplied) measure the
front of the compactor’s adjustable base and use those
dimensions to cut out your custom toekick. Secure as
appropriate to installation.

Note:

The custom toekick should

be installed in such a manner that
it can be removed if service is
required.

Installation

Built-In Compactors

Step 6
Optional
custom
toekick

This manual is related to the following products: