beautypg.com

Window installation –12 – GE 23-11-2129N-002 User Manual

Page 9

background image

Customer Service

Troubleshooting T

ips

Operating Instructions

Safety Instructions

Installation Instructions

Read completely, then follow step-by-step.

Window Requirements

These instructions are for a standard double-
hung window. You will need to modify them for
other types of windows.

The air conditioner can be installed without the
filler panels if needed to fit in a narrow window.
See the window opening dimensions to the right.

All supporting parts must be secured to firm
wood, masonry or metal.

The electrical outlet must be within reach of the
power cord.

Window opening dimensions are for a

standard double-hung window.

18

5

8

min.

30

3

4

to 46

1

2

(with filler panels)

26

3

4

min.

(without filler panels)

Storm Window Requirements

A storm window frame will not allow the air

conditioner to tilt towards the outside and will keep

it from draining properly. To adjust for this, attach a

piece of wood to the stool.

WOOD PIECES—

WIDTH:

2

LENGTH:

Long enough to fit inside the window

frame.

THICKNESS:

To determine the thickness, place a

piece of wood on the stool to make it 1/2

higher

than the top of the storm window frame.
Attach securely with nails or screws provided by

the installer.

1/2

higher

than frame

Storm window
frame

Wood

Stool

1

2

9