beautypg.com

Prime/tool fill/recirculation reed switch, Removal, Installation – Graco 258906 User Manual

Page 25

background image

Prime/Tool Fill/Recirculation Reed Switch

3A0246C

25

Prime/Tool Fill/Recirculation Reed Switch

Removal

1.

Perform Pressure Relief Procedure, see page 4.
Wait 5 minutes before servicing.

2.

Remove four screws (33b) and remove display
cover (33k).

3.

Remove bottom two screws (61) and remove control
panel (37).

4.

Unplug reed switch (87) from control board.

5.

Unscrew reed switch (87) from control panel (37).

Installation

1.

Apply thread sealant to end of reed switch (87).
Hand-tighten reed switch until it is tight against
control panel (37).

2.

Add thread sealant and tighten jam nut against
threaded bus.

3.

Connect reed switch (87) to control board (24).

4.

Replace control panel (37) and tighten bottom two
screws (61). Torque to 30-35 in-lb.

5.

Replace display cover (33k) and torque four screws
(33b) to 30-35 in-lb.

NOTE: Make sure noise shield tabs are routed to the
inside of the control box when assembling.

33b

33k

ti15786a

ti15795a

37

61

87

ti13572a

37

87

ti13573a

87

37

ti13574a

ti13576a

87

ti13572a

24

ti15795a

37

61

33b

33k

ti15786a

This manual is related to the following products: