Prime/tool fill/recirculation reed switch, Removal, Installation – Graco 258906 User Manual
Page 25
Prime/Tool Fill/Recirculation Reed Switch
3A0246C
25
Prime/Tool Fill/Recirculation Reed Switch
Removal
1.
Perform Pressure Relief Procedure, see page 4.
Wait 5 minutes before servicing.
2.
Remove four screws (33b) and remove display
cover (33k).
3.
Remove bottom two screws (61) and remove control
panel (37).
4.
Unplug reed switch (87) from control board.
5.
Unscrew reed switch (87) from control panel (37).
Installation
1.
Apply thread sealant to end of reed switch (87).
Hand-tighten reed switch until it is tight against
control panel (37).
2.
Add thread sealant and tighten jam nut against
threaded bus.
3.
Connect reed switch (87) to control board (24).
4.
Replace control panel (37) and tighten bottom two
screws (61). Torque to 30-35 in-lb.
5.
Replace display cover (33k) and torque four screws
(33b) to 30-35 in-lb.
NOTE: Make sure noise shield tabs are routed to the
inside of the control box when assembling.
33b
33k
ti15786a
ti15795a
37
61
87
ti13572a
37
87
ti13573a
87
37
ti13574a
ti13576a
87
ti13572a
24
ti15795a
37
61
33b
33k
ti15786a