Generac 005031-2 User Manual
Page 3
Table of Contents
Liquid-cooled 25 kW Generators
1
INTRODUCTION ............................................... IFC
Read this Manual Thoroughly ..................................... IFC
Operation and Maintenance ........................................ IFC
How to Obtain Service ................................................. IFC
Authorized Service Dealer Location ............................ IFC
SAFETY RULES ....................................................2
Standards Index ..............................................................3
Section 1 — GENERAL INFORMATION ............. 4
1.1 Generator
..............................................................4
1.2 Transfer
Switch
.....................................................4
1.3
ATS Mode (Automatic Operation) ..........................4
1.4
Generator AC Connection Systems ........................4
1.5 Main
Circuit
Breaker
.............................................4
1.6 Generator
Fuel
System
..........................................5
1.7 Engine
Protective
Devices
......................................5
1.8 Unpacking
.............................................................6
1.9 Lifting
the
Generator
.............................................6
1.10 Specifications
........................................................6
1.11 Fuel
Consumption
.................................................7
1.12 Reconfiguring the Fuel System for LP Vapor .........7
1.13 Engine
Oil
Recommendations
...............................7
1.14 Coolant
Recommendations
....................................8
1.15 Before
Installation
.................................................8
Section 2 — INSTALLATION ............................. 8
2.1 Standby
Generator
Installation
.............................8
2.2 Generator
Location
...............................................9
2.3
Generator Mounting and Support .........................9
2.4
Basic Standby Electric System ..............................9
2.5
Emergency Circuit Isolation Method ...................10
2.6
Total Circuit Isolation Method .............................10
2.7 Grounding
the
Generator
....................................10
2.8
Generator AC Neutral Connections .....................10
2.9
Using a “GTS” Transfer Switch ...........................10
2.10 Battery
Installation
..............................................11
2.11 Preparation Before Start-Up ................................12
Section 3 — OPERATION ................................ 12
3.1
GTS Transfer Switch ...........................................12
3.2 Control
Console
Components
..............................13
3.3
Manual Transfer and Startup ..............................15
3.4
Engine Governor Gain Adjustments ....................15
3.5
Manual Retransfer and Shutdown .......................15
3.6 Automatic
Operation
...........................................16
3.7
Weekly Exercise Cycle .........................................16
3.8
Control Board DIP Switch Settings .....................16
3.9
Voltage Regulator Adjustment ..............................17
Section 4 — MAINTENANCE ........................... 17
4.1
Maintenance Performed by Authorized
Service Facilities ..................................................17
4.2 Exhaust
Manifold
Procedure
...............................18
4.3 Intake
Manifold
Procedure
..................................18
4.4 Cylinder
Head
Procedure
....................................18
4.5 Cooling
System....................................................18
4.6
Overload Protection for Engine DC
Electrical System .................................................19
4.7 Checking
Fluid
Levels
.........................................19
4.8
Maintenance Owner/Operator
Can Perform ........................................................19
4.9 Miscellaneous
Maintenance
.................................21
4.10 Scheduled
Maintenance
.......................................22
Section 5 — TROUBLESHOOTING ................. 25
Section 6 — ELECTRICAL DATA .................... 26
Section 7 — EXPLODED VIEWS AND
PARTS LISTS ............................. 34
Section 8 — INSTALLATION DIAGRAM .......... 51
Section 9 — WARRANTY ............................... .52