Existing structure, Factory avionics location – Garmin PAV80 User Manual
Page 10
PS Engineering
PAV80 Series IFE System
Installation and Operator’s Manual
200-800-0101
Page 2-2
Rev 2 Sept. 2003
2.00”
6.31”
2.3.3 Mounting Rack Installation
Remove the unit from the mounting tray by unscrewing the 3/32" hex-head screw that is near the left edge
of the unit. Carefully slide the unit free of the tray. Set the unit aside in a safe location until needed. Install
the tray using six FHP 6-32 x ½" screws. The unit must be supported at front and rear of the mounting tray.
See Appendix B.
The tray mounting can be made in any area that exists for adding additional avionics. Instrument panel
mounting is accomplished in accordance with AC 43.13-2A, Chapter 2.
Existing Structure
(from behind
panel)
Avionics Mounting Rails
Existing Transponder
Center Avionics Stack
Factory Avionics Location
Factory Avionics Mounting Rails
Figure 2-2 Avionics Mounting Rails (Typical)
Figure 2-1 Typical Tray Installation Location