Test facilities, Gas storage, Back pressure – GE Gas Turbine User Manual

Page 25: Florence plant indoor stands for gas turbine tests, Florence plant outdoor string and load test stands, Ge energy gas turbines, Florence plant stand utilities

background image

NATURAL GAS

2

1

FLORENCE PLANT

Indoor stands for gas turbine tests

to test

beds 1-4

L U B E O I L
C O N S O L E

D

L U B E O I L
C O N S O L E

C

V A C U U M

S Y S T E M

L U B E O I L
C O N S O L E

B

L U B E O I L
C O N S O L E

A

C O N T R O L

R O O M

A

D I E S E L

TA N K

Shop electric generator + gear box

Gas turbine test

Shop electric motor + gear box

Gas turbine test :
Low pressure shaft

3

4

5

C

O

N

T

R

O

L

R

O

O

M

B

8

I N D O O R

T E S T

S TA N D S

M O B I L E

V A C U U M

S Y S T E M

7 a

7 b

2

4

3

1

5

FLORENCE PLANT

Outdoor string and load test stands

Centrifugal/ axial compressor test

Gas turbine test

Shop electric generator + gear box

C

O

N

T

R

O

L

R

O

O

M

B

L U B E

O I L

TA N K

C O N T R O L

R O O M

A

6

GE Energy carries out mechanical tests on all its gas turbines. Complete turbocompressors and
turbogenerators, including all auxiliary equipment, can be full-load tested on outdoor test beds
complying with API, ASME, VDI and ISO international standards at the Florence or Massa plants.
Even complete modules can be tested at the Massa plant and than shipped without being this
assembled because of its proximity to the Massa harbor. The test beds are equipped with
computer Data Acquisition Systems capable of collecting thermodynamic and mechanical data
and computing in real time. Test facilities include a high pressure feed system for gas mixtures
(inert and flammable gases), a gas chromatograph for gas analysis, a 60 Hz generator, low and
high pressure gas coolers, and steam and lube oil supply. The cooling towers allow closed-loop
tests up to 130 MW. GE Energy also tests complete plants on site upon customer request.

25

GE Energy Gas Turbines

Test Facilities

ME

ASURING

ST
A

TION

2BVTN

2HM

GAS

STORAGE

c

b

d

e

a

L U B E O I L
C O N S O L E

L U B E

O I L

TANK

LIQUID

GAS

COMPRESSED

AIR

SYSTEM

MOBILE

VACUUM
SYSTEM

ELECTRIC

SYSTEM

D I E S E L

TA N K

To Test Beds

To Test Beds

To Test Beds

a

,

d

,

e

CONTROL

ROOM

B

CONTROL

ROOM

A

From Test Beds

Ev

aporating

To

w

e

rs

Gas turbine test

Centrifugal / axial compressor test

Hydraulic dynamometer

f

f

g

b

f

f

f

MASSA PLANT

Outdoor stands for gas turbine tests
and turbogroup full load tests

NA
TURAL GAS

c

a

,

b

,

c

,

d

Steam System

COGENERATION

PLANT

I N D O O R

T E S T

S TA N D S

FLORENCE PLANT

Stand Utilities

COMPRESSED

AIR

SYSTEM

ELECTRIC

SYSTEM

LIQUID

GAS

Back

Pressure

TO INDOOR

AND OUTDOOR

STANDS

e

FROM INDOOR
AND OUTDOOR

STANDS

FROM

DOMESTIC
NETWORK

OUTDOOR

STANDS

Air cooler

GAS

STORAGE

2BVTN

2BVTN

2HM

TO OUTDOOR
STANDS 5 - 8

TO OUTDOOR
STANDS 1 - 4

ME
ASURING

ST

ATION

e

Cooling Water

b

a

d

Evaporating

Towers

Condenser

Steam generator

TO INDOOR STANDS FOR GAS TURBINE TESTS 1 - 4