beautypg.com

Optional gas line installation, Venting installation, Continued – FMI (V)S36 User Manual

Page 11

background image

www.fmiproducts.com

111026-01G

11

OptiOnal gas line installatiOn

Figure 19 - Gas Line Knockout

Side

Firebrick

Finished

Side

Refractory

Knockout

Plug

Outside of

Fireplace

Gas Line

Conduit

Insulation

Gas

Conduit

Cover

1/2" Dowel

(see Figure 20, page 12). Note: Secure

incoming gas line to wood framing to

provide rigidity for threaded end.

4. Repack insulation around gas line and into

sleeve opening. Seal any gaps between

gas line and refractory knockout hole with

refractory cement or commercial furnace

cement, Install the gas appliance or cap-

off gas line if desired.

Venting installatiOn

Continued

30E-8DM

EFFECTIVE HEIGHT
OF TERMINATION CAP

EFFECTIVE HEIGHT
OF TERMINATION CAP

EFFECTIVE HEIGHT
OF TERMINATION CAP

EFFECTIVE HEIGHT
OF TERMINATION CAP

MINIMUM
HEIGHT

14.5 FT.

MINIMUM

UP TO
6FT. MAX.

UP TO
6FT. MAX.

HEIGHT

14.5 FT.

MIN. HEIGHT
OF 22 FT. (WITH
2 ELBOW SETS)
MAX. HEIGHT OF
50 FT.

MAX. HEIGHT
50 FT.
(ANY SYSTEM)

30E-8DM

Figure 18 - Typical Residential Installations

Gas line hook up should be done by your

supplier or a qualified service person.
Note: Before you proceed, make sure your

gas supply is turned off.
Use only a 1/2" black iron pipe and appropri-

ate fittings.
1. Remove knockout indentation on refrac-

tory or firebrick wall located above the

refractory hearth floor. The knockout

indentation must be firmly tapped with any

solid object such as a 1/2" dowel until it is

released. Remove fragmented portions of

refractory (see Figure 19).

2. Remove gas line cover plate located on

either side of fireplace and pull out insu-

lation from gas line conduit sleeve. Save

insulation for reuse. Replace screws.

3. Run a 1/2" black iron gas line into the

fireplace through the rear at gas line

conduit sleeve (if using a raised platform,

add height). Provide sufficient gas line into

fireplace chamber for fitting connection