beautypg.com

Preparing for installation, Safety recommendations, Site requirements – H3C Technologies H3C MSR 800 User Manual

Page 8

background image

1

Preparing for installation

Safety recommendations

WARNING!

Before installation and operation, read all of the safety instructions in

Compliance and Safety Guide

supplied with your router.

Follow these general safety recommendations:

Turn off all power and remove all power cables before opening the chassis.

Unplug all power and external cables before moving the chassis.

Before installation, locate the emergency power switch so that you can shut off power
immediately if necessary.

Always wear an ESD wrist strap when installing the router.

Do not stare into an open optical interface. The light can cause permanent eye damage.

Use a good grounding system. This is essential for reliable operation.

Confirm that the resistance between the chassis and the ground is less than 1 ohm.

Site requirements

The router can only be used indoors.
This section provides information about temperature, humidity, cleanness, and air quality requirements,
as well as rack-mounting requirements and protection against damage from lightning and EMI.

Table 1 Temperature and humidity requirements

Temperature Relative

humidity

0°C to 40°C (32°F to 104°F)

5% to 90%

Table 2 Dust concentration limit in the equipment room

Substance

Concentration limit (particles/m

3

)

Dust particles

≤ 3 x 10

4

(No visible dust on desk in three days)

NOTE:

Dust particle diameter ≥ 5 μm

Table 3 Harmful gas concentration limits

Gas Max.

(mg/m

3

)

SO

2

0.2

H

2

S 0.006

This manual is related to the following products: