beautypg.com

Installation check list – Paloma PH-28c Direct Vent User Manual

Page 25

background image

25

A. Water Heater Location

q

Close to area of vent termination.

q

Indoors and protected from freezing temperatures .

q

Proper clearance from combustible surfaces
observed.

q

Sufficient fresh air supply for proper operation of
water heater.

q

Air supply free of corrosive elements and
flammable vapors.

q

Provisions made to protect area from water
damage.

q

Sufficient room to service heater.

q

Combustible materials, such as clothing, cleaning
materials, rags, etc. clear of the heater and vent
piping.

q

Water heater is properly attached to the wall.

B. Water Supply

q

Water supply has sufficient pressure.

q

Air purged from water heater and piping.

q

Water connections tight and free of leaks

q

Water filter is clean and in place.

q

Materials used are as instructed in this manual.

q

Water pipes are insulated and protected from

freezing.

C. Gas Supply

q

Gas type matches rating plate.

q

Gas supply pressure is sufficient for the water
heater.

q

Gas line equipped with shut-off valve, union and
sediment trap.

q

Approved pipe joint compound used.

q

Soap and water solution used to check all
connections and fittings for possible gas leak.

q

Gas Company inspected installation (if required).

D. Relief Valve

q

Pressure Relief Valve properly installed and
discharge line run to open drain

q

Discharge line protected from freezing.

E. Venting

q

Vent pipe material should be category III and meet

UL1738 in US and ULC.636 in Canada.

q

Vent connector(s) pitched downward to termination
(¼" per foot of length minimum) See page 14.

q

Vent connector(s) securely fastened together with
high temperature silicone (500°F) (260°C) and air-
tight.

q

All vent runs are properly supported.

q

Vent terminal is properly installed.

q

Sufficient combustion air is available.

q

Maximum and minimum vent lengths are
observed.

F. Electrical Wiring

q

Voltage matches rating plate.

q

Water heater is properly grounded.

q

Supply cord and/or wiring meets all local codes.

G.

q

Air Intake Pipe

q

Connected to the air intake tee/vent termination
and heater.

q

All vent runs are properly supported.

q

Maximum and minimum vent lengths are
observed.

q

Connected securely together and airtight.

Installation Check List

This manual is related to the following products: