AXING SKM 1-03 User Manual
Page 2

Operation Instructions
SKM 1-03/-04/-05/-06 and 2-03/-04
2
© AXING AG | Switzerland | Reserving change in design and type - We cannot be held liable for printing errors
2014-09-17
Assembly, installation and service must be carried out by authorized and skilled electricians.
Switch off facility operating voltage or pull out mains plug before starting assembly or service work.
Facility assembly:
In dust-free, dry environment, protected against humidity, vapors, splash water and moisture. In a
location protected against solar radiation. Not within close distance of heat sources. In ambient
temperature of <50°C.
Ensure sufficient ventilation of the device. Do not cover the ventilation slots! - Avoid short circuits!
Damages arising from incorrect connection and/or improper operation are excluded from any liability.
Please observe all relevant standards, regulations and guidelines regarding installation and operation
of antenna facilities.
Ground SAT headends using equipotential bonding rails according to EN 50083-1,
EN 60728-11:2010.
Do not carry out any installation and service work during thunderstorms.