Planning, Trenching, Leaving jobsite – Ditch Witch RT30 User Manual
Page 35

Operation Overview - 34
RT30 Operator’s Manual
Planning
CMW
Planning
1. Gather information about jobsite. See page 36.
2. Inspect jobsite. See page 37.
3. Classify jobsite. See page 38.
4. Select chain and teeth to match your soil type, if necessary. See page 58.
5. Check supplies and prepare equipment. See page 40.
6. Haul equipment to jobsite. See page 49.
Trenching
1. Start unit. See page 42.
2. Position tractor and controls. See page 54.
3. Begin trenching. See page 55.
4. Complete the installation. See page 55.
5. Backfill the trench. See page 62.
6. Shut down tractor. See page 44.
Leaving Jobsite
1. Backfill if necessary. See page 62.
2. Rinse equipment. See page 62.
3. Stow tools. See page 62.
4. Haul equipment away from jobsite. See page 49.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT9 (165 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)