beautypg.com

Hale TPM Sistem User Manual

Page 6

background image

Hale Products Inc. • A Unit of IDEX Corporation • 700 Spring Mill Avenue • Conshohocken, PA 19428
Phone: 610/825-6300 • Fax: 610/825-6440 • 800-220-4253 • www.haleproducts.com

6

OPERATION

The TPM Relief Valve System is set as follows:

Set the red pressure indicator on the PMD control valve to a position slightly above the normal operating
pressure (even before you are flowing water)

Once you have reached normal operating pressure (as indicated on your master pressure gage) slowly move
the adjusting handwheel counterclockwise until the QG relief valve opens and the amber indicator light
comes on.

Then turn the handwheel about 1/2 turn clockwise until the indicator light goes off. The relief valve will now
operate at the “’set pressure”.

When the pump is not in operation, the handwheel should be turned clockwise back to a position slightly
above the normal operating pressure.

Remember that the red indicator on the panel is only a ROUGH indication of what pressure the TPM is set
for. Always use the above procedure to properly set the system,

Operation with TPM and DDEC Pressure Governor

Set the TPM red pressure indicator on the PMD control valve to a position slightly above the normal operating
pressure (even before you are flowing water).

Power on the governor control.

Set the discharge pressure using the RPM mode of the pressure governor control.

Move the TPM handwheel counterclockwise until the QG relief valve opens and the amber indicator light
comes on. Then turn the handwheel 1 to 1-1/4 turns clockwise and the amber light goes out.

Put the Governor Control in the ‘’pressure governor’’ mode. The system is now set.

When changing the “ set pressure” while running, follow this procedure:

1.

2.

3.

4.

5.

1.

2.

3.

4.

5.