Install the hood – Broan WC26I User Manual
Page 12
- 12 -
INSTALL THE
HOOD
DUCTED AND NON-
DUCTED HOODS
Note: at least two people
will be required to mount
the hood.
1. Raise the hood into its
mounting position.
2. Align the rectangular
opening on the back of
the hood with the wall-
mounting bracket. Gently
lower the hood until it
securely engages the
bracket. Fig. 14.
3. Level the hood with (2)
3.9x9.5mm mounting
screws and secure with
(4) 4.8x38mm mounting screws. Use
drywall anchors provided if wall studs or
framing are not available. Fig. 14.
4. Mount the electrical system plate attaching
it with (3) 3.9x9.5 mounting screws. Fig.15.
5. On ducted hoods, attach 6” round metal
duct between the hood’s blower collar
and duct that leads to the outside location.
6. On non-ducted hoods, attach 5” round
metal expandable duct between the 5”-6”
adapter on the hood the connector on the
plenum.
7. Tape all duct joints to make them secure
and air tight.
8. Plug the power cord into the electric wall
receptacle. Tuck excess cord behind the
flue.
FIG. 14
MOUNTING
SCREWS
(4.8x38mm)
RECTANGULAR
CUTOUT
WALL FRAMING
MOUNTING
BRACKET
FIG.15
ELECTRICAL
SYSTEM
PLATE
MOUNTING SCREWS
(3.9x9.5mm)