Installing azek rail with glass infill – AZEK Rail User Manual
Page 5
Page 5
Installing AZEK Rail with Glass Infill
TRIM RAILS, EXTRUSIONS, AND GASKETS
INSTALL BOTTOM SUPPORT RAIL
5
4
• Measure distance between the posts at the Bottom Support Rail.
• Transfer measurement to Top & Bottom Rails, Top Support Rail and cut
to length.
• Measure and cut Top and Bottom Glass Channels, and Rubber Gaskets
to appropriate lengths.
• Position rail assembly onto Support Blocks.
7/64” Pre-drill
#8 x 3” Green
Coated Screws
Cut Rubber Gaskets
with utility knife
Glass Channels must be at
least 4” shorter than rail.