beautypg.com

Installing azek rail with glass infill, Install lower support block, Cut and assemble bottom support rail – AZEK Rail User Manual

Page 4: Install post sleeves

background image

Page 4

Installing AZEK Rail with Glass Infill

39” above deck surface is
optimal for 36” railing heights.

If you do not have a the template,
position the top of the Support Block 4”
above the deck.

INSTALL LOWER
SUPPORT BLOCK

• Position template at
bottom of post

sleeve above post
skirt.

CUT AND ASSEMBLE BOTTOM SUPPORT RAIL

• Cut the Bottom Support Rail to length.

3

1

2

Optimal

39”

For angled rail installations - align

angled face of Support Block

parallel to rail section.

Straight Section

Angled Section

Center screw aligned

to rail centerline

Foot Block

#8 x 3”
Coated

Screw

Bottom Support

Rail

1/2

1/2

Center screw

aligned to rail

centerline

Bracket set

flush to rail

face

Bracket set

flush to rail

face

Pre-drill 7/64”

#8 x 3/4”

Coated Screws

For sections up to 6’: Place one Foot
Block in the center of the rail

INSTALL POST
SLEEVES

• Trim Post Sleeves to

desired length.

• Slide Post Sleeve and

Post Skirt over post.
(DO NOT FORCE)

• Ensure post are

square and plumb.

4”

Template

Support

Block

Post Skirt

7/64” Pre-drill

#8 x 3” Green Coated

Screws