Metpar Phenolic User Manual
Page 2

Table of Contents
•
Stop! Before you begin. Page 1
•
Suggested tools. Page 1
•
Metpar tips. Page 2
•
Hardware nomenclature Page 2
•
Step 1 - Layout Page 3
•
Step 2 - Prepare Stiles Page 3
•
Step 3 - Position Panel Page 3
•
Step 4 - Attach Stiles Page 4
•
Step 5 - Secure stiles to panel Page 5
•
Step 6 - Headrail & Panel fasten Page 5
•
Step 7 - Install Door Page 5
•
Step 8 - Care & Maintenance Page 6
•
Step 9 - Need Help? Page 6
Before you begin, note the following…
•
Caution, safety first! Be certain to have and use the proper safety gear.
•
Structural support in the walls, floors and/or ceiling is not supplied by Metpar. Verify that
adequate blocking has been installed where necessary before you proceed.
•
This installation manual is intended to be used in conjunction with the layout drawings
prepared by Metpar. Refer to the layout drawings for further information such as; product
style (ie: The Corinthian FP-500 Overhead Braced), stall width and depth, ceiling height (for
ceiling hung or floor-to-ceiling), individual component sizes (ie: panels, stiles &/or doors), etc.
You will need the layout drawings to determine the centerline markings for drilling locations.
•
When the material is shipped to you, an Initial Release (packing list) is included. Be certain
that all items you need have been ordered and shipped properly.
Suggested Tools…
For your convenience, we recommend that you have the following tools;
Tape measure, chalk line, pencil, masking tape (to help you layout drilling locations), electric or
battery operated drill, drill bits including torx pin head T27 bit, screwdriver (slotted and phillips
head), center punch, plumb-bob, level, hacksaw, hammer, shims, support blocks (12” high).
METPAR CORP, 95 State Street, Westbury, NY, USA, 11590 Tel: 516-333-2600, Fax: 516-333-2618
Page 1