beautypg.com

Installation, Base pod, 1 installing the base – Alcatel Carrier Internetworking Solutions Versatis Conference Phone User Manual

Page 28

background image

28

2. INSTALLATION

Base

Pod

l

Place the base and Pod units on a flat, stable surface.

2.1

INSTALLING THE BASE

2.1.1

Connecting the base

l

Plug the base power supply cable into the

socket at the back of the base.

l

Connect the mains adapter to a 230 V / 50 Hz electrical socket.

"

The red power indicator on the base should light up.

l

Plug one end of the phone cable into the

socket at the back of the base, and the other into the phone line socket.

2.1.2

Wall mounting (optional)

To wall-mount the base, follow this procedure:

l

Make sure that the base unit is not too far from a power socket and that you do not drill through any electrical wiring concealed in
the wall.

l

Drill three holes using the template provided on page 143 of this guide.

l

Insert three screws (not supplied) into the holes. Leave the screw heads approximately 3 mm proud of the wall.

l

Slide the base unit down over the screw heads.

Versatis_Conference_uk.qxd 31/03/2005 16:03 Page 28