Installation, Base pod, 1 installing the base – Alcatel Carrier Internetworking Solutions Versatis Conference Phone User Manual
Page 28
28
2. INSTALLATION
Base
Pod
l
Place the base and Pod units on a flat, stable surface.
2.1
INSTALLING THE BASE
2.1.1
Connecting the base
l
Plug the base power supply cable into the
socket at the back of the base.
l
Connect the mains adapter to a 230 V / 50 Hz electrical socket.
"
The red power indicator on the base should light up.
l
Plug one end of the phone cable into the
socket at the back of the base, and the other into the phone line socket.
2.1.2
Wall mounting (optional)
To wall-mount the base, follow this procedure:
l
Make sure that the base unit is not too far from a power socket and that you do not drill through any electrical wiring concealed in
the wall.
l
Drill three holes using the template provided on page 143 of this guide.
l
Insert three screws (not supplied) into the holes. Leave the screw heads approximately 3 mm proud of the wall.
l
Slide the base unit down over the screw heads.
Versatis_Conference_uk.qxd 31/03/2005 16:03 Page 28