Tp series, Start-up report – HOMA TP Series User Manual
Page 11
TP Series
Installation, Operation & Maintenance Manual
START-UP REPORT
To validate warranty, please answer the following questions during start-up as completely and as accurately as
possible and mail this form to:
HOMA PUMP TECHNOLOGY INC.
390 BIRMINGHAM BOULEVARD
ANSONIA, CT 06401
ATTN: SERVICE MANAGER
Receipt of completed report will initiate operational warranty.
Reports that are not returned can delay or void warranty.
1.) Pump User's Name: _____________________________________________________________
Site Location: __________________________________________________________________
Site Contract: __________________________________________________________________
Unit Supplied By: _______________________________________________________________
2.) HOMA Pumps Model__________________________________ Serial No._____________________
Voltage____________ Phase_________________ Hertz________________ Horsepower________
Method Used to Check Rotation (viewed from bottom) __________________________________
Does Impeller Turn Freely By Hand: YES________ NO _________
3.) Condition of Equipment: EXCELLENT_____________ GOOD ____________ AVERAGE___________
Condition of Cable Jacket : EXCELLENT___________GOOD ____________ AVERAGE___________
Resistance of Cable and Pump Motor (measured at pump control)
1 Phase: U1 – U2 _________ Ohms; U1 - Z2 ________ Ohms; U2 – Z2 _________ Ohms; T1 – T2 ________Ohms
3 Phase: U - V_____________ Ohms; V - W ____________Ohms; U -W _________Ohms, T1 – T2 ________ Ohms
Resistance of Ground Circuit Between Control Panel and Outside of Pump __________Ohms
MEG Ohm Check of Insulation:
U to Ground _______________ V to Ground _______________ W to Ground____________
4.) Condition of Equipment at Start-Up: Dry __________ Wet _____________ Muddy_________
Was Equipment Stored:_______________ Length of Storage ________________________
Describe Station Layout ___________________________________________________________
5.) Liquid Level Controls: Model_____________________________ Type ______________________
Is Control Installed Away From Turbulence?____________________________________________
Operation Check: ( IF FLOAT SWITCHES SUPPLIED).
Tip lowest float (stop float), all pumps should remain off.
Tip second float (and stop float), one pump comes on.
Tip third float (and stop float), both pumps on (alarm on simplex).
Tip fourth float (and stop float), high level alarm on (omit on simplex).
6.) Electrical Readings:
Single Phase:
Voltage Supply at Panel Line Connection, Pump Off, L1- L2 _______ L1-Ground ______ L2-Ground _________
Voltage Supply at Panel Line Connection, Pump On, L1- L2 ________ L1-Ground _______ L2-Ground ________
Amperage: Load Connection, Pump On, U1________________ U2 _______________ Z2 _________
Resistance Across Thermal Switch leads T1-T2 _______ ohms
Three Phase:
Voltage Supply at Panel Line Connection, Pump Off, L1-L2_________ L2-L3 _______ L3-L1 ______
Voltage Supply at Panel Line Connection, Pump On, L1-L2_________ L2-L3 _______ L3-L1 ______
Amperage Load Connection, Pump On, L1_____________ L2_____________ L3_______________
Resistance Across Thermal Switch leads T1-T2 _______ ohms
Pg. 11