beautypg.com

HOMA Conversion Kit For Installation Of HOMA GRP Pump On 2,5 Myers Rail Systems User Manual

HOMA Pumps

background image

Publication

88PN3030A

Please Contact Technical Support At 203-736-8890 With Any Additional Questions

Please Be Prepared To Provide Pump Serial Number During Call

Page

1 of 2

Conversion Kit For Installation of HOMA

GRP Pumps On 2½” Myers Rail

Systems

Use existing Myers hardware to connect the HOMA pump to the Myers rail system

following the procedure below.

























• Thread the 2” X 2 ½” bushing fully onto the discharge of the new HOMA pump after

applying red thread locking compound.

• After applying red thread locking compound, thread the flange threads onto the male

threads of the bushing. Tighten fully until two of the flange bolt holes are in a
horizontal position.

• Align and fasten the flange to the Myers bracket using existing bolts and new gasket

provided. Tighten the bolts equally. If existing bolts are damaged, obtain qty (4) new
5/8”-11 x 1 1/2”bolts.

• Remove the pump handle from the HOMA pump and rotate the handle 180

0

so that

the high side of the handle is on the same side as the pump discharge connection,
and reattach.

• Thread locking cap onto the threaded portion of the support column. Thread together

loosely as the cap will be used for final adjustment.


• Slide the support column down through the upper bracket of the Myers rail system

so that the notch is over the handle of the HOMA pump.