HOMA Conversion Kit For Installation Of HOMA GRP Pump On 2,5 Myers Rail Systems User Manual
HOMA Pumps
Publication
88PN3030A
Please Contact Technical Support At 203-736-8890 With Any Additional Questions
Please Be Prepared To Provide Pump Serial Number During Call
Page
1 of 2
Conversion Kit For Installation of HOMA
GRP Pumps On 2½” Myers Rail
Systems
Use existing Myers hardware to connect the HOMA pump to the Myers rail system
following the procedure below.
• Thread the 2” X 2 ½” bushing fully onto the discharge of the new HOMA pump after
applying red thread locking compound.
• After applying red thread locking compound, thread the flange threads onto the male
threads of the bushing. Tighten fully until two of the flange bolt holes are in a
horizontal position.
• Align and fasten the flange to the Myers bracket using existing bolts and new gasket
provided. Tighten the bolts equally. If existing bolts are damaged, obtain qty (4) new
5/8”-11 x 1 1/2”bolts.
• Remove the pump handle from the HOMA pump and rotate the handle 180
0
so that
the high side of the handle is on the same side as the pump discharge connection,
and reattach.
• Thread locking cap onto the threaded portion of the support column. Thread together
loosely as the cap will be used for final adjustment.
• Slide the support column down through the upper bracket of the Myers rail system
so that the notch is over the handle of the HOMA pump.