Veris Technologies OpticMapper - Operating Instructions User Manual
Page 11

Pub.# OM17-OpticMapper
3-1
Section 3
Implement Overview and Set-up
Figure 1
If the unit is crated, the row unit (Figure 2) will have to be installed. The row unit mounting location
is shown in figure 3. If equipped, the front tongue many also need to be installed. To do so,
please take precautions to ensure that the framework is properly supported to ensure safety.
Figure 2
Figure 3
Row Unit
Pull-tongue
(opt.)
EC coulter-
electrodes
OpticMapper
Controller
Row unit mount
Weight Mount
for opt. weight
package