Maintenance – Lochinvar 000 - 500 User Manual

Page 60

background image

8

Maintenance

60

Installation & Service Manual

IMPORTANT

Upon completion of any testing on the
gas system, leak test all gas connections
with a soap solution while main burners
are operating. Im me di ate ly repair any
leak found in the gas train or re

lat

ed

components. Do Not operate an
appliance with a leak in the gas train,
valves or related piping.

Gas Train and Controls

GAS FLOW

Figure 8-4_Gas Train 90,000 - 399,999 Btu/hr Models

Figure 8-5_Gas Train 500,000 Btu/hr Model

Review with owner

1. Review the User’s Information Manual with the owner.

2. Emphasize the need to perform the maintenance schedule

specified in the User’s Information Manual (and in this
manual as well).

3. Remind the owner of the need to call a licensed contractor

should the appliance or system exhibit any unusual
behavior.

4. Remind the owner to follow the proper shutdown procedure

and to schedule an annual start-up at the beginning of the
next heating season.

This manual is related to the following products: