Kohler ODEON VITREOUS CHINA P/S-TRAP TOILET K-8741T User Manual
Page 6

-6-
7. CONNECT PUSH BUTTON
Put large flange through hole in lid. Screw retaining ring onto
flange. Turn the screw inside the push button flange to secure
tank lid to flush valve assembly. Make certain that the flush
valve assembly is adjusted high enough that the button
touches the assembly.
Put green and white push
rods into corresponding holes and trim flush with the top of
the flange.
Install flush buttons.
See 6 .
See Fig. 7 .
See Fig. 8 .
7.
6
7
8
£
Fig. #7
7
7
8
1
2
5
3
4
1&1 1/2 tour
6
1037406-T01-A
This manual is related to the following products:
- ODEON VITREOUS CHINA P/S-TRAP TOILET K-8709T ODEON VITREOUS CHINA P/S-TRAP TOILET K-8766T ODEON VITREOUS CHINA P/S-TRAP TOILET K-11184T ODEON VITREOUS CHINA P/S-TRAP TOILET K-8710T ODEON VITREOUS CHINA P/S-TRAP TOILET K-8753T ODEON VITREOUS CHINA P/S-TRAP TOILET K-8711T ODEON VITREOUS CHINA P/S-TRAP TOILET K-8767T