Operation – IOGear GCS1732 User Manual
Page 15
13
Operation
Hot Plugging
The MiniView™ Extreme supports USB hot plugging – components can be removed and added back into
the installation by unplugging their cables from the CPU ports without the need to shut the unit down.
Powering Off and Restarting
If it becomes necessary to power off the MiniView™ Extreme unit, before starting it back up you must do
the following:
1. Shut down all the computers that are attached to the switch.
Note: You must unplug the power cords of any computers that have the
Keyboard Power On function that are connected to the shut down switches.
Otherwise, the switches will still receive power from the computers.
2. Unplug the switch’s power adapter cable.
3. Wait 10 seconds, then plug the switch’s power adapter cable back in.
4. After the switch is up, power on the computers.