beautypg.com

Installation instructions, 265 volt electrical supply, Reinstall junction box – GE 5500 User Manual

Page 16: Reinstall junction box cover, Power connection chart

background image

Installation Instructions

16

265 VOLT ELECTRICAL SUPPLY

REINSTALL JUNCTION BOX

Reinstall the junction box by engaging the tab at the

lower rear, aligning the screw hole at the top and
driving the one screw until secure. Be sure that all
wire leads are inside the box and not pinched
between the box and the unit. The green insulated
ground wire from the unit MUST be connected to
the branch circuit ground wire.
Make all wire connections by using appropriate
UL-listed electrical connectors and techniques
(black to black, white to white and green to green).

4

REINSTALL JUNCTION
BOX COVER

1 Carefully tuck all wires and

connections back inside the
junction box. Be sure there
are no loose connections or
stray uninsulated wires
exposed.

2 Place the junction box cover

in place. Replace the two
screws removed earlier and
tighten securely.

3 Discard the unused portion of the plug and

the cordset.

5

230/208 Volt

Power

Wall Plug

Heater Wattage

Supply Kits

Configuration

Circuit Protective Device

@ 230/208 Volts

RAK3152

Tandem

15 Amp Time Delay Fuse or Breaker

2.55/2.09 KW

RAK3202

Perpendicular

20 Amp Time Delay Fuse or Breaker

3.45/2.82 KW

RAK3302*

Large Tandem

30 Amp Time Delay Fuse or Breaker

5.00/4.10 KW

265 Volt

Power

Wall Plug

Heater Wattage

Supply Kits

Configuration

Circuit Protective Device

@ 265 Volts

RAK5152

Does Not Apply

15 Amp Time Delay Fuse or Breaker

1.7 KW

RAK5172

Does Not Apply

15 Amp Time Delay Fuse or Breaker

3.0 KW

RAK5202

Does Not Apply

20 Amp Time Delay Fuse or Breaker

3.7 KW

RAK5302*

Does Not Apply

30 Amp Time Delay Fuse or Breaker

5.0 KW

* Not recommended for use on 7000 BTUH units.

POWER CONNECTION CHART