Important, Side view – Huffy 21168202 User Manual
Page 10
10
P/N 21168202 10/04
4
3
Fill hole completely with concrete.
6.
1" (2.54 cm)
5
1" (2.54 cm)
7.
Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions
several times while concrete is curing.
1" (2.54 cm)
SIDE VIEW
DRAINAGE HILL
IMPORTANT!:
CONTINUE ON TO NEXT STEP.
DO NOT WAIT FOR CONCRETE TO CURE.
IMPORTANT!:
WAIT A MINIMUM OF 24 HOURS BEFORE
GOING ON TO NEXT STEP. CONCRETE MUST CURE.
PLAYING SURFACE
Make a reference mark
here for anti-skid tape.
NOTE A:
Keep flange pushed down
to concrete and leveled.
NOTE B: