beautypg.com

Installation procedure – haier AB282ACERA User Manual

Page 26

background image

24

Check whether indoor unit is horizontal with leveler or polythene pipe filled with water , and check
that the dimension of the ceiling opening is correct. Take off the lever gauge before install the ornament
panel.

Fasten the screws to make the height difference between the two sides of indoor unit less than 5mm.

First fix it with screws temporally.

Fasten the two temporally fixing screws
and other two, and tighten the four screws.

Connect the wires of synchro-motor.

Connect the wire of signal.

If no response of remote controller,
check whether the wiring is correct,
restart remote controller 10 seconds
after shut off power supply.

Install the panel board in the direction shown in the figure.
The incorrect direction will result in water leakage,
meanwhile swing and signal receiving are displayed that
cannot be connected.

(For series 182 )

AB182ACEAA

POWER SUPPLY: 1PH,220-230V~,50Hz

1

2

3

L

N

1

2

3

Electric control box

Y/G

Y/G

INDOOR UNIT

TERMINAL BLOCK

OUTDOOR UNIT

TERMINAL BLOCK

Installation Procedure