beautypg.com

Safety opera tion maintenance setup – Harbor Freight Tools Pacific Hydrostar 212cc Gasoline Powered Clear Water Pump 69774 User Manual

Page 8

background image

Page 8

For technical questions, please call 1-800-520-0882.

ITEM 69774

5. For the discharge hose, slide a Hose Coupling Ring

over the remaining Hose Coupler (a) and place a

Gasket onto the end of the Hose Coupler (b).

a

b

6. Thread the Hose Coupling Ring clockwise onto

the Discharge Port until tightened securely.

Discharge Port

7. Slide a Hose Clamp over the end of the

Discharge Hose (a). Slide the Discharge Hose

onto the Hose Coupler (b). Use a screwdriver

to tighten the Hose Clamp until secure.

a

b

SAFETY

OPERA

TION

MAINTENANCE

SETUP