Important, Side view – Huffy Sports Basketball Systems User Manual
Page 11

02/04
P/N 21145507
11
1" (2.54 cm)
5.
Note A
Make a reference mark
here for anti-skid tape.
Note B
Keep flange pushed down
to concrete and leveled.
Tamp down concrete to release air pockets and build drainage hill. Level pole
section in all directions several times while concrete is curing.
After concrete has cured, remove bottom pole section from ground sleeve (4). Place
anti-skid tape (6) around the bottom area of bottom pole (see note A).
6
4
6.
5
IMPORTANT!:
WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP. CONCRETE MUST CURE.
Note A
Place top edge of anti-skid
tape on mark made in step 5.
Note B
Tape prevents the pole
from rotating during play.
1" (2.54 cm)
SIDE VIEW