beautypg.com

Test running – Heat Controller DMH24DB-1 User Manual

Page 34

background image

34 Multi type Air Conditioner

1. Check that all tubing and wiring have been properly con-

nected.

2. Check that the gas and liquid side service valves are

fully open.

1) Prepare remote controller

Remove the battery cover by pulling it according to
the arrow direction.
Insert new batteries making sure that the (+) and (–)
of battery are installed correctly.
Reattach the cover by pushing it back into position.

NOTE:
• Use 2 AAA(1.5volt) batteries. Do not use rechargeable

batteries.

• Remove the batteries from the remote controller if the sys-

tem is not going to be used for a long time.

2) Precautions in test run

The initial power supply must provide at least 90% of
the rated voltage.
Otherwise, the air conditioner should not be operated.

For test run, carry out the cooling operation firstly
even during heating season. If heating operation is
carried out firstly, it leads to the trouble of compres-
sor. Then attention must be paid.

Carry out the test run more than 5 minutes without
fail. (Test run will be cancelled 18 minutes later auto-
matically)

The test run is started by pressing timer cancel button
five times continuously. (Room type)

To cancel the test run, press any button.

3) Settlement of outdoor unit

Anchor the outdoor unit with a bolt and nut(ø10mm)
tightly and horizontally on a concrete or rigid mount.

When installing on the wall, roof or rooftop, anchor the
mounting base securely with a nail or wire assuming the
influence of wind and earthquake.

In the case when the vibration of the unit is conveyed to
the hose, secure the unit with an anti-vibration rubber.

4) Evaluation of the performance

Operate unit for 15~20 minutes, then check the system
refrigerant charge:
1. Measure the pressure of the gas side service valve.
2. Measure the temperature of the intake and discharge of

air.

3. Ensure the difference between the intake temperature

and the discharge is more than 8°C(14.4°F) (Cooling) or
reversely (Heating).

Bolt

Tubing connection

Test Running

Split Type

Discharge

temperature

Discharge air

Intake temperature

R-410A

35°C (95°F)

8.5~9.5kg/cm

2

G(120~135 P.S.I.G.)

Outside ambient

TEMP.

Refrigerant

The pressure of the gas side

service valve.

Test Running