Flaring work and connection of piping, Flaring work – Heat Controller DMH24DB-1 User Manual
Page 18
18 Multi type Air Conditioner
Flaring Work and Connection of Piping
Flaring work
Main cause for gas leakage is due to defect in flaring work. Carry out correct flaring work in the following procedure.
Cut the pipes and the cable.
1. Use the piping kit accessory or the pipes purchased locally.
2. Measure the distance between the indoor and the outdoor
unit.
3. Cut the pipes a little longer than measured distance.
4. Cut the cable 1.5m (5.0ft) longer than the pipe length.
Burrs removal
1. Completely remove all burrs from the cut cross section of
pipe/tube.
2. Put the end of the copper tube/pipe in a downward direction
as you remove burrs in order to avoid dropping burrs into the
tubing.
Putting nut on
• Remove flare nuts attached to indoor and outdoor unit, then
put them on pipe/tube having completed burr removal.
(not possible to put them on after flaring work)
Flaring work
• Carry out flaring work using flaring tool as shown below.
• Firmly hold copper pipe in a die in the dimension shown in the
table above.
Copper
pipe
90
°
Slanted Uneven Rough
Pipe
Reamer
Point down
Flare nut
Copper tube
mm
inch
mm
Ш6.35
1/4
0~0.5
Ш9.52
3/8
0~0.5
Outside diameter
A
Bar
Copper pipe
Clamp handle
Red arrow mark
Cone
Yoke
Handle
Bar
"A"
Flaring Work and Connection of Piping