Installation – Hotpoint RZM61 User Manual
Page 4
Installation
Levelling:
Level the freezer when it is in its final location by adjusting the front feet, until firm
contact is made with the floor. This will stop rocking or vibration and keep the door
aligned which helps the freezer run reliably and efficiently.
Note: Before plugging in and switching on, leave the freezer standing in its
final location for at least 15 minutes to allow it to settle.
4
SAFET
Y &
INST
ALL
A
TION
Defrost Tube:
A tube is supplied to help feed defrost water into a collecting vessel, ie. a bowl (see
‘Defrosting’ in the CLEANING & MAINTENANCE section).
For safe keeping until required, the tube can be stored in the floor of the freezer
compartment.
Floor of the freezer compartment
Defrost tube in storage position
Joining:
Equal height Hotpoint fridges and freezers can be joined together to look like one
unit by using a Filler Kit available from Hotpoint Genuine Parts & Accessories Mail
Order Hotline (see KEY CONTACTS, back page).