INITIAL POWER ON

At the initial application of power to the system, the compressor and the evaporator fans
will be in a 4 minute hold-off cycle and will not start immediately. When there is a call for
COOLING, the expansion valve (EEV) opens, then the compressor is started. The
compressor will then run for a minimum of 2 minutes in the “hold-on” cycle. (This means
that the compressor will run for a minimum of 2 minutes before shutting off even if the box
temperature is met.)

The LED alternately displays

BOX TEMPERATURE

and

MODE

of operation. On a call for

cooling,

dLY

will show while the expansion valve is opening. After the compressor starts

the LED will alternately display

BOX TEMPERATURE

and

Coo

.

On multiple evaporator systems the MASTER evaporator will display

BOX

TEMPERATURE

and

Coo

. The SLAVE evaporators will display

Coo

only.

When the room thermostat setting is satisfied, and if the compressor ran for at least 2
minutes, the EEV will close and the compressor will pumpdown and shut off. The
evaporator fans will continue to run. The LED will alternately display

oFF

and

BOX

TEMPERATURE.

When the room sensor detects a rise in temperature of approximately 2°F, and the
compressor has been off for at least 4 minutes, the EEV will open to its last position then
the compressor will start. The valve is then adjusted as necessary to obtain the setpoint
superheat setting. During this time, the compressor will run for a minimum 2 minutes “hold-
on” cycle.

The four minute “Hold-off” can be bypassed and the system started immediately by
pressing the “Reset” button on the Beacon II board.

OPERATING MODE DISPLAY

oFF

- Off

Coo

- Cooling

Pdn

- Pumpdown

dEF

- Defrost

drn

- Draining

dLY

-

Delay

tSt

- Test

SEr

- Service