Installing, Mower – HONDA MM60 User Manual
Page 28

INSTALLING
MOWER
&joint Detaches From Mid-PTO
Detaching Mid-PTO and Mower Drive Shaft
1
engine off, PTO selector set to "REAR" and
key removed, reach under tractor and grasp the
locking collar of the U-joint of the mower
shaft.
2. Pull locking collar back (toward front of tractor)
to release spline of Mid-PTO. Pull the U-joint
away from the PTO, towards the mower to
remove.
NOTE:
If
the locking collar is difficult to release,
turning it clockwise and counterclockwise will help
free it.
3.
sure that U-joint is placed where
it
will
not
be
crushed by tractor tires when tractor is
backed over pulley covers.
Arm
Lift
Arms Fasten to Mower Deck
Detaching Lift Joints
when pulling pins as mower deck may drop
slightly.
1.
Pull
pins attaching
lift
joints
to.
lift plates brack-
Keep fingers clear of brackets
ets
as
illustrated.
NOTE:
If
hydraulic
lift
system is not fully down,
pins may be under tension and mower deck may
descend slightly. Make sure to keep fingers clear.
2. After detaching, temporarily replace clevis pins
in brackets and secure with cotter pins
to
keep
from losing or misplacing them. The
lift
joints
should remain attached
to
the mower, not the
lift
arms.
26