beautypg.com

Tool set up, Safety opera tion maintenance setup – Harbor Freight Tools 68048 User Manual

Page 4

background image

Page 4

For technical questions, please call 1-800-444-3353.

Floor Jack

Operating Instructions

Read the ENTIRE IMPORTANT SAFETY INFORMATION section at the beginning of this

manual including all text under subheadings therein before set up or use of this product.

Tool Set Up

Attaching the Handle

1. Fasten the Upper Handle to the Lower Handle.
2. Loosen the Set Screw and insert the

assembled Handle into the Handle Socket.

3. Tighten the Set Screw.

Bleeding

1. Loosen the Fill Screw.
2. Insert the Handle into the Handle Socket

to operate the Release Valve.

3. Turn the Handle counterclockwise to open the valve.

4. Pump the Handle up and down quickly several

times to purge air from the system.

5. Tighten the Fill Screw.

Adding Oil

1. Remove the Fill Screw.
2. Add high grade hydraulic fluid into the Fill Screw

slowly until the oil reaches the top of the oil fill hole.

Note: Do not touch the Handle when

adding the hydraulic oil.
3. Replace the Fill Screw.

SAFETY

OPERA

TION

MAINTENANCE

SETUP

This manual is related to the following products: