Installation – Hotpoint RFA06 User Manual
Page 4
Installation
Levelling:
Level the fridge freezer when it is in its final location by adjusting the front feet, until
firm contact is made with the floor. This will stop rocking or vibration and keep the
doors aligned which helps the fridge freezer run reliably and efficiently.
Note: Before plugging in and switching on, leave the fridge freezer standing
in its final location for at least 15 minutes to allow it to settle.
4
SAFET
Y &
INST
ALL
A
TION
Defrost Tube:
A tube is supplied to help feed defrost water into a collecting vessel, ie. a bowl (see
‘Defrosting’ in the CLEANING & MAINTENANCE section).
For safe keeping until required, the tube can be stored in the floor of the freezer
compartment.
Floor of the freezer compartment
Defrost tube in storage position
WARNING: Failure to level the appliance correctly may result in misalignment
of the cabinet and/or doors.