Prepare jobsite, Install fluid unit, Consider load requirements – Ditch Witch FM5 User Manual
Page 30: Installation tips, Prepare jobsite install fluid unit, Fm5 operator’s manual, Consider load requirements installation tips
FM5 Operator’s Manual
Prepare - 29
Prepare Jobsite
CMW
Prepare Jobsite
Install Fluid Unit
Consider Load Requirements
Installation Tips
•
Drill holes through trailer cross members to provide adequate connection to trailer structure, not just
deck boards.
•
Use high-quality, properly-sized mounting hardware.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment.
NOTICE:
•
If jobsite classification is in question or if the possibility of unmarked electric utilities exists, classify
jobsite as electric.
•
Cutting high voltage cable can cause electrocution. Expose lines by hand before digging.
•
All vegetation near operator’s station must be removed. Contact with trees, shrubs, or weeds during
electrical strike could result in electrocution.
IMPORTANT: The FM5 unit must be installed on a trailer or truck that meets the following requirements.
•
All trailer or truck components including axles and tires are in good condition.
•
Axle loads meet US requirements. In countries other than the US, check local regulations.