5. installing electrode holder and work clamp, Piece – Hobart Welding Products STICKMATE OM-949 User Manual
Page 15
OM-949 Page 11
3-5. Installing Electrode Holder And Work Clamp
Ref. 802 251-A / 803 583-B
Y Turn Off unit and disconnect
input power before installing
electrode holder or work
clamp.
Removing Barrel From Elec-
trode Holder
1
Electrode Holder
2
Barrel
3
Access Hole
4
Set Screw
Loosen set screw through access
hole and slide barrel away from
electrode holder.
Installing Electrode Cable and
Barrel onto Electrode Holder
5
Electrode Cable From Unit
(Has Bare Conductors on
End)
6
Terminal Screw
Back out terminal screw from elec-
trode holder. Insert electrode cable
through barrel into end of electrode
holder and tighten terminal screw
securely.
Move barrel toward electrode hold-
er and tighten set screw to secure
barrel in place.
Installing Work Cable onto Work
Clamp
7
Work Clamp
8
Work Cable From Unit (Has
Ring Terminal on End)
9
Mounting Bolt
Route work cable through work
clamp as shown and install onto
mounting bolt using supplied hard-
ware.
6 mm
Tools Needed:
14 mm
1
4
2
3
6
5
8
9
7
PIECE