beautypg.com

Sequence of operations, Honeywell s89f – HP SU-2A User Manual

Page 10

background image

10

Fig. 5 Wiring Diagram for Honeywell S89F

SEQUENCE OF OPERATIONS

Honeywell S89F

1.

Limits close.

2.

Blower motor starts as the 24 Volt transformer powers the airflow switch.

3.

Power from the airflow switch to the S89F control initiates 34 second pre-purge.

4.

At the end of the pre-purge, the spark is energized for 4 seconds. At the same time, the 24

Volt transformer powers the gas valve, allowing the fuel to flow.

5.

Within 4 seconds, the flame should be established and proved. The spark will shut off and

the control will hold power to the gas valve until the limits open and the burner stops firing.

6.

If the flame is not established, the blower motor continuously runs.

7.

To restart, power should be interrupted for five minutes. Then turn on the power to start

this sequence again.