Secondary installation – Enviro DV50DX User Manual
Page 32
Secondary Installation
Figure 43: The first log to be placed
is the front right log. The back
end has a hole that sits on the right
burner pin (see Figure 42) and the
front has a notch that helps it rest on
the center of the grate against one of
the vertical bars. Second to be placed
is the bottom log. The bottom log
rests on the center and right ledge in
the firebox (see Figure 42) and the
large end must be flat against the
right brick liner.
Figure 44: The back left log rests
on the left ledge in the firebox (see
Figure 42) and the left ledge on the
bottom log (see Figure 43). The large
end must be flat against the left brick
liner.
Figure 45: The top of the far left
log has a hole that rests on the pin
and ledge of the back left log (see
Figure 44). The bottom of the far left
log rests against the base of the left
andiron. The top of the far right
log has a hole that rests on the right
pin and ledge of the bottom log (see
Figure 43) and the bottom of the far
right log rests against the base of the
right andiron.
Figure 43. First Stage Log Set Installation
Figure 44. Second Stage Log Set Installation
Figure 45. Third Stage Log Set Installation
32