Chapter 2: setup, 1 assembling the monitor arm/base, 2 cable management – Asus Republic of Gamers Swift PG279QM 27" 16:9 G-SYNC 240 Hz QHD HDR IPS Gaming Monitor User Manual
Page 15: Assembling the monitor arm/base -1, Cable management -1
2-1
ASUS PG279QM Series LCD Monitor
2.1
Assembling the monitor arm/base
1. Insert the base into the arm.
2. Fix the base to the arm by fastening the bundled screw.
We recommend that you cover the table surface with soft cloth to prevent
damage to the monitor.
Base screw size: M6 x 15 mm.
2.2
Cable management
You can organize the cables with the help of the input/output port cover.
• Arranging the cables
• Using the input/output port cover:
the cover can be attached or detached.
This manual is related to the following products: