beautypg.com

Echo RM-210SB User Manual

Page 14

background image

14

PLASTIC

SHIELD

INSTALLATION

(For Nylon Line Operation)

Tools Required: Screwdriver

Parts Required: Plastic Shield, Shield Plate, three (3) 5mm x 16mm

screws

NOTE
The plastic shield is for use with the Nylon Line Head only.
Install Metal Shield when using plastic or metal blades.

1. Remove plastic sleeve and upper plate (A) from PTO shaft.

2. Install the shield on the bottom of the bearing housing flange.

3. Place shield plate (B) on shield, align holes and install three (3)

5x16 mm screws.

4. Install upper plate (A).

NYLON

LINE

HEAD

INSTALLATION

(Use with Plastic Shield)

Tools Required: Head Locking Tool

Parts Required: Nylon Line Head

1. Be sure upper adaptor plate remains on PTO shaft.

2. Align locking hole in upper plate with notch in edge of gear housing

and insert head locking tool (C).

3. Thread line head onto shaft by turning it counter clockwise until

head is tight against upper plate.

4. Remove head locking tool.

FRONT

HANDLE

INSTALLATION

Tools Required: Screwdriver

Parts Required: Front Handle Assembly

1. Position front handle for comfortable operation and secure screws.

B

A

C