2/ installation en – DE DIETRICH DHD1190B User Manual
Page 19
19
2/ INSTALLATION
EN
Before installing the appliance, make sure that none of the parts is damaged in any way.
In case of damaged parts, contact your retailer and do not proceed with installation.
Read all of the following instructions carefully before installing the appliance:
- Utilise an air extraction tube that has a maximum length of not more than 5 metres.
- Limit the number of curves in the ducting because each curve reduces the extraction effi-
ciency as one linear metre (e.g., if two 90° curves are utilised the length of the ducting should
not exceed 3 metres in length).
- Use a material approved by standards and regulations.
- Avoid any drastic changes of direction.
- Avoid any sudden changes in the pipe section (recommended constant diameter: Ø 150 mm
or equal surface area).
- Utilising rigid tubing is recommended and not flexible tubing.
The manufacturer shall not respond for air capacity or noise problems due to non- com-
pliance with above mentioned instructions, and no warranty shall be given.
INSTALLATION Of THE PRODUCT IN THE fREESTANDING VERSION.
The freestanding version must be installed only with accessories: DHD1191 B/W/G.
Place the drilling template (fig.1) on the wall and make all the holes shown.
Insert the plugs in all the drilled holes and then screw in only the screws into the two upper plugs
without tightening them and leave 2/3 mm space between the head of the screw and the wall.
Fit the two L-brackets to the wall in correspondence to the previously inserted lower plugs, as
indicated in Fig. 2A.
Hang the appliance on the screws , as shown in fig. 2; secure the appliance by tightening the
side screws corresponding to the ‘L’ brackets, see fig. 2 A.
Carry out the electric connection.
Install the outer cover by inserting it from its top side as per fig. 5, slightly widening the rear
lower side (see fig.5 A) so that you can hang it to the appliance.
Top air out-let (suctioning version): remove the top cap and insert the rectangular flange
and eventually the transition piece for the round pipe (fig. 6), install the telescopic chimneys
and fix them on their upper side by using their suitable bracket, as shown in fig.7.
All the components needed for the top air out-let are supplied along with the upright
pipes kit.
Top air out-let (filtering version): remove the top cap and place the air out-led grid, see fig.
8. Activated charcoal filters are also needed, along with metal grease filters, in the filtering
version; see the ‘Maintenance’ chapter.