Part 2 installation – Elektra Beckum Cool 401 User Manual
Page 11
11
11.02
2.6.3
Connection conden-
sate draining
Fig. 4: Connection conden-
sate draining
The condensate drain pipe (fig. 2.1) may be fixed to the
wall with a rising slope of maximum 5 m. Thereby the
minimum operation pressure increases for 0,1 bar per
meter. The collecting pipe (fig. 2/2) should be laid through-
out its whole length at least as the cross-section of the
condensate outlet.
to treatment
2
1
from condensate drain
Part 2
Installation
This manual is related to the following products: