Thermo Pride Spirit Gas TG9S Single Stage PSC 95.5% User Manual
Page 18

1083287-UIM-A-0114
18
Johnson Controls Unitary Products
FIGURE 24: Upflow Configuration
INDUCER ROT
A
TED FOR
LEFT
SIDE VENTING
(As required for 130K model)
UPFLOW
AS RECEIVED
(Except for 130K Model)
INDUCER ROT
A
TED FOR
RIGHT
SIDE VENTING
When drain hose routing changes are required, be sure to cap all un-used openings.
If rerouting hoses - excess length should be cut of
f so that no sagging loops will collect
and hold condensate, which will cause the furnace to not operate.
Shorten
pressure
switch hose
Re-route and
shorten
pressure
switch hose
Shorten
rain
gutter
hose
Move rain
gutter hose
to this position
For 100, 120 & 130K input furnaces, the condensate
drain is plumbed toward the left casing outlet from the factory.
For 040, 060 & 080K input furnaces, the condensate
drain is plumbed toward the right casing outlet from the factory.
Condensate drain may exit cabinet on either side.
1
2
1
2
130 K Model does not have provisions for top venting, it must be vented through a side opening.